Refurbishing a rental after the Renters' Rights Act: how to plan works now

Tenancies are periodic and Section 21 has gone. How Bristol landlords should plan refurbishment around voids they no longer control, and the deadlines to 2035.

Wilson & Cole Developments15 October 20265 min read

House keys in hand: since 1 May 2026, tenants decide when most voids happen (stock photograph)

Since 1 May 2026, every assured shorthold tenancy in England has become a periodic tenancy, Section 21 has gone, and a tenant can leave on two months' notice. For landlords, the Renters' Rights Act changes one thing above all when it comes to refurbishment: you no longer choose when a unit goes empty. At Bristol's average rent of £1,880 a month, every empty week costs about £434. Below: how to plan works around that, what can be done with tenants in, and every confirmed compliance date between now and 2035.

Renters' Rights Act for landlords: what changed on 1 May 2026

Before 1 May 2026Since 1 May 2026What it means for works
TenancyFixed-term ASTsAssured periodic, no end dateNo term end to plan a refurb around
Ending itSection 21 or Section 8Section 8 grounds onlyYou cannot end a tenancy just to refurbish
Tenant leavingUsually at term endTwo months' notice, any timeVoids arrive on the tenant's timetable
Rent increasesBy agreement or review clauseOnce a year, Section 13, two months' noticeA refurbished unit reprices at the next increase or re-let
Rent in advanceNo capOne month maximumLess cash up front at re-let
PetsCould refuse outrightTenant can ask; refusal needs a good reasonSpecify hard-wearing floors and finishes

The government's guide to the Renters' Rights Act confirms rent increases now go through a Section 13 notice once a year, at market rate, with at least two months' notice, and that tenants can challenge them at tribunal.

Why voids are harder to plan, and the cost of getting it wrong

The ONS puts Bristol's average private rent at £1,880 a month in July 2026, up 6.5% on the year. That gives a simple void cost:

Void lengthRent lost at £1,880 a month
One weekabout £434
Two weeksabout £868
Four weeksabout £1,735
Eight weeksabout £3,471

The two months' notice a tenant gives is now your preparation window. Use it, or the void starts with a survey, a quote and a wait for the kitchen, and you lose rent for every week of it. The fix is to have the scope surveyed and priced before anyone gives notice, so long-lead items are ordered the day the notice lands. Our guide to refurb-to-let between tenancies sets out what a crew can finish in two, four and eight weeks.

What about ending a tenancy to do the work? Ground 6 still exists. The government's grounds for possession guidance says it applies where you need to redevelop or demolish the property and the tenant cannot live there while that happens; it usually cannot be used in the first six months of a tenancy, and it needs four months' notice. The conditions are specific. Take legal advice before relying on it, and do not plan a routine refurbishment around it.

Works with tenants in: what is realistic, what is not

Some work is perfectly manageable in an occupied unit, with the tenant's agreement and proper notice. Some is not.

Realistic with a tenant inBetter left for a void
Electrical remedials and alarm upgradesKitchen replacement
Boiler swap and heating controlsBathroom replacement
Loft insulation top-upFull or partial rewire
Extract fans, gutters and other damp causesInternal wall insulation
Single-room decorationLayout changes and new openings

On an occupied unit we would survey with the tenant's agreement, book the work in short visits within our 8am to 5pm, Monday to Friday site hours, and clean down before leaving. The damp-related items in the left column matter more than they used to: the new Decent Homes Standard includes a criterion that a home should be free of damp and mould, and Awaab's Law is being extended to private rentals.

The compliance pipeline, date by date

DateWhat happensStatus
1 May 2026Phase 1 tenancy reforms in forceIn force
15 Dec 2026"Register your rental property" service opens; you can register any property from this date, £65 per property per yearConfirmed
15 Aug 2027Registration rules commence for South West properties, including BristolConfirmed
14 Nov 2027Deadline to register South West propertiesConfirmed
2028Mandatory sign-up to the PRS Landlord OmbudsmanRoadmap date
1 Oct 2029An EPC C under the current method, issued before this date, counts until it expiresConfirmed policy
1 Oct 2030EPC C or equivalent for private rentals, £10,000 cost cap per propertyConfirmed policy, not yet law
2035New Decent Homes Standard applies to private rented homesConfirmed policy
Not setAwaab's Law for private rentalsSubject to consultation

Sources: the government's implementation roadmap, the Housing Hub registration timetable and the January 2026 Decent Homes Standard policy statement, which also sets out the EPC C requirement. Our piece on the delayed new EPC explains why the 2029 date matters most.

A phasing plan for a small portfolio

For a portfolio of three to ten Bristol units, this is the order we would work in:

  1. Survey every unit this winter. Occupied or not. Record the current EPC, electrical and gas certificates, and the condition of kitchens, bathrooms and heating.
  2. Sort the works into three lists. In-situ works, void-only works, and EPC fabric works. Our EPC readiness checklist helps with the third.
  3. Do the in-situ list first. Alarms, electrical remedials, loft insulation and damp causes, in short visits through the winter.
  4. Price the void list now. A detailed, itemised quote per unit, held on file, so a tenant's notice triggers an order, not a conversation.
  5. Fold EPC works into each void. Fabric first, then heating. Our EPC upgrade cost guide for Victorian rentals shows the costs.
  6. Register by 14 November 2027. With certificates already in order.

We can run this as a programme for landlords and developers, with one specification across the portfolio and invoicing against valuations of work carried out. We are SafeContractor approved (certificate OC4217) and TrustMark registered (licence 4264445). See our developer and landlord services, renovation work and energy retrofit service.

Frequently asked questions

Can I end a tenancy to refurbish under the Renters' Rights Act?

Not with Section 21, which has been abolished. Ground 6 covers redevelopment or demolition where the tenant cannot live in the property during the works, usually not in the first six months, with four months' notice. The conditions are specific, so take legal advice before relying on it.

How much notice does a tenant give to leave?

Two months, at any time, now that tenancies are periodic. That two months is your window to order materials and book the works, so have the scope surveyed and priced in advance.

When do Bristol landlords need to register their properties?

The rules for South West properties, including Bristol, commence on 15 August 2027, and the deadline to register is 14 November 2027. The service opens on 15 December 2026 and you can register from then. The fee is £65 per property per year.

When does the Decent Homes Standard apply to private rentals?

From 2035, under the government's January 2026 policy statement. It includes a criterion that homes should be free of damp and mould, so damp work done now counts twice.

What work can be done with a tenant in place?

Electrical remedials, alarms, boiler and heating controls, loft insulation, extract fans and single-room decoration are realistic with the tenant's agreement and proper notice. Kitchens, bathrooms, rewires and internal wall insulation are best left for a void.

Send us the spec or the property list. We'll price it unit by unit. Start with the addresses here.

Renters' Rights ActlandlordsrefurbishmentvoidsDecent Homes StandardEPC CBristol

Keep reading

Reading done. Ready for real numbers?

A site visit and a detailed, itemised quote turn research into a plan.

  1. You tell us the ideaThree quick questions — no essay required.
  2. We call within a working dayA real conversation about what your house can take.
  3. A visit, then an itemised quoteEvery line written down, and only if you want one.
Start your enquiry0117 251 0365
On site
Mon–Fri, 8am–5pm
Office calls
until 6pm weekdays
We reply
within one working day
CallWhatsAppGet a quote